top of page


Aquatic Centre

area plans 2

area plans 1
Aquatic Centre
HND Graded Unit
The main objective of the project was to design a new competition aquatic centre to be located on the old steel work area of Ravenscraig.
The centre was to provide a competition pool, diving pool, hydro therapy pool and teaching pool, with a viewing area over the main pools.
As the centre would be located next to the Ravenscraig sports centre the design to harmonize with each other in some aspect
bottom of page